GreenJacket Header

Installation Instructions

GROW -IN PERMEABLE Installation instructions, Stretch out the cover to be as tight as possible. Place one Sod Staple Every 3 feet around the perimeter edge of the cover. Make sure to place the staple in the fold over edge area (see photo) so you are going through two layers of the folded section. Down each seam, place a Sod Staple every 10 feet down each seam.
 
 









© 2003-2008 GreenJacket® | Sitemap | Privacy Policy | Contact

All rights reserved. GreenJacket® is protected by law under a U.S. patent.